CatalystBox
Three scenarios · salary uncertainty · honest odds
Which Education Pays Back?
Each path now runs three futures — Dream, Base, and Worst — weighted by the odds you set. A Monte Carlo band shows how salary uncertainty widens or tightens the range. The headline is always the expected outcome, not the brochure.
A
Expected value₹20.0 LExpected IRR9.4%Base break-even10.2 yrs
Dream ₹60.9 LBase ₹20.6 LWorst −₹22.8 L
B
Expected value−₹48.3 LExpected IRR0.0%Base break-evennever
Dream −₹36.1 LBase −₹26.5 LWorst −₹51.2 L
Engineering wins outright
Higher expected lifetime value, better return per rupee, and faster break-even across all three scenarios. Govt Job (UPSC) is a long-odds bet — the worst-case scenario carries 87% of the probability weight.
Base scenarios head to head
Engineering baseGovt Job (UPSC) basebreak-even
◀ EngineeringGovt Job (UPSC) ▶
₹20.0 LExpected lifetime value−₹48.3 L
9.4%Expected return (IRR)0.0%
10.2 yrsBase break-even ↓never
₹60.9 LDream-case value−₹36.1 L
−₹22.8 LWorst-case value−₹51.2 L
MC band: base growth ±2% · discounted at 8% · 300 trials
Editing
Borrowing
Dream scenario
Base scenario
Salary uncertainty (Monte Carlo)
The band on the chart shows where 80% of salary trajectories land given this spread. Set higher for volatile fields (startups, abroad); lower for stable ones (govt, academia).
Worst scenario
How to use this tool
Compare education costs, time and forgone earnings with dream, base and worst-case return scenarios.
These tools are illustrative starting points for reflection, not forecasts, diagnoses or promises.